In line with the on-going efforts of the Department of Energy (DOE) to facilitate private sector investment in missionary areas, Coastal Consortium, incorporated as 3i Powergen, Inc. was awarded as the New Power Provider (NPP) of the following electric cooperatives:

Marinduque Electric Cooperative, Inc. (MARELCO)
Romblon Electric Cooperative, Inc. (ROMELCO)
Tablas Island Electric Cooperative, Inc. (TIELCO)

This project is the result of National Power Corporation Small Power Utilities Group (NPC-SPUG) objective to privatize its operations. The International Finance Corporation (IFC), serve as the Transaction Advisor of these three pilot projects of the government.

3i Powergen,Inc. is implementing the Hybrid Wind-Diesel Technology of power generation in these particular power plants.

Projects



• 16.55-MW Hybrid Wind-Diesel Power Plant in Marinduque
• 9.75-MW Hybrid Wind-Diesel Power Plant in Tablas
• 3.70-MW Hybrid Wind-Diesel Power Plant in Romblon

Project Location

• Bgy. Balogo, Sta Cruz, Marinduque
• Bgy Tubigon, Ferrol, Tablas, Romblon
• Bgy. Cajimus, Romblon, Romblon

Electric Cooperatives

• Marinduque Electric Cooperative, Inc. (MARELCO)
• Tablas Island Electric Cooperative, Inc. (TIELCO)
• Romblon Electric Cooperative, Inc. (ROMELCO)

For more details visit: 3i Powergen Inc. Website

Project Updates

¬ The three (3) power plants are still under construction

 